what to do?
Hey all,
With the new job and all I have been a bit too busy to be posting. The good news is that I do actually have more free time now that I am no longer driving 3 or 4 hours per day away. 8^) Unfortunatly I am spending most of that time catching up on three years of lost sleep. 8^P I think thats getting better though, as I am not quite as twitchy when I try to go to bed these days. I am also feeling better when I wake up in the morning as well. 8^) In better and more home renovation news, the rooms with the fancy insulation job are really impressing me with their ability to stay warm. 8^) This weekend some of the trim will be going up and the last fiddly bit of wall work will be finished. 8^) We should be painting the front room on Saturday, and hanging some of the new trim and perhapse the window trim in both rooms on Sunday. We spent last Saturday at Ikea. 8^) I really like that place. 8^) They have added some parts to their kitchen cabinets, very cool I can now add a built in plate rack and wine rack to the kitchen design. I am kind of glad that I didn’t jump the gun and do the kitchen already, or I would have midded out on them.. 8^) Found the lights for the middle bedroom there as well…. 8^) I still need to buy them though.. Probably after Xmas, as I am going to be too busy till then to worry about them.. Also, they have added some displays focusing on useing Ikea stuff to create small boutique stores. I saw the Ikea version of a clothing store and liked the storage / display solution enough that it is very likely going to be the storage solution for the new mega walk in closet / dressing room. The floor to ceiling racks were very cool, and cheep as well.. Double bonus. Hopefully Friday night on the way home from work I will also be stopping by Home Despot and picking up the new toilet for the downstairs half bath from hell and by sometime friday night that will actually be usefull down there. 8^) If things go really well on Saturday morning I will run to Lowes and pick up the vessal sink I saw there for the Half bath and by Sunday night the room will only be needing baseboards. 8^)
Ivan
